I’ve gotten lots done the last couple days. All the Spartan’s window garnish trims are polished and installed, accent lights on the display shelves in, bulkhead cabinet lights over the bed are installed. The dump valves are on the black and grey tanks are on and I replaced the leaking seal in the Dometic “Sea/Land” toilet. Not very glamorous but needed.
The new Zip-Dee awning should be done this week, the screen doors need to be built and I have get the new center front window in. The upholsterer needs to get busy, my work is almost done!
I can see the finish line.
Posted: September 2, 2016 in spartan trailer, Tin Can Tourists, transportation, travelTags: glamping, Spartan trailer, tiny house, vintager camper
Comments
The polished garnish moldings and accent lighting look great!
Beautiful work, Brian.